Steel figure of a pole vaulter on the façade of the Athletics Hall
We manufactured an over 8-meter steel figure of a pole vaulter and installed it on the façade of the new sports and training arena in Wrocław.
The piece was produced using stainless-steel laser cutting technology, welding, and decorative coating finishes. Due to its size, the figure consists of several parts joined together in an almost invisible way.